技術(shù)文章
鐘罩閥工作結(jié)構(gòu)原理
閱讀:6117 發(fā)布時(shí)間:2018-12-7鐘罩閥工作原理
A:環(huán)鏈葫蘆型chain hoist
鐘罩閥主要由閥座、鐘罩、閥體、閥蓋、提升吊桿、提升架及吊桿潤(rùn)滑密封系統(tǒng)、環(huán)鏈電動(dòng)葫蘆和爬梯系統(tǒng)組成。鐘罩與閥座為鑄鋼件,控制鐘罩與閥座的相對(duì)位置關(guān)系就能達(dá)到控制流體流量的目的。工作時(shí),閥座是安裝在管道上不動(dòng)的。鐘罩經(jīng)吊桿,穿過(guò)潤(rùn)滑密封系統(tǒng)與環(huán)鏈電動(dòng)葫蘆的吊鉤連接成一體。當(dāng)環(huán)鏈電動(dòng)葫蘆得到動(dòng)作信號(hào),開(kāi)啟鐘罩閥時(shí),環(huán)鏈電動(dòng)葫蘆拉起吊鉤,吊桿垂直上升,從而將鐘罩提升,這樣就使鐘罩與閥座產(chǎn)生了距離,鐘罩閥兩端的管路就連通了,實(shí)現(xiàn)煙氣的排放。反之,環(huán)鏈電動(dòng)葫蘆吊鉤下降,鐘罩在重力的作用下落下,直到接觸到閥座,這樣就將管路兩端的煙氣截?cái)嗔恕?br />Bell valve is mainly composed of valve seat, bell, valve body, valve cover, lifting boom, poppet and derrick lubrication sealing system, chain electric hoist and the ladder system. Bell bell and seat for steel casting, control the relative position of relationship with the valve seat can achieve the goal of controlling fluid flow. At work, the seat is installed on the pipeline. Bell after the boom, through the lubrication and sealing system chain electric hoist crane connection into a whole. When get action signal chain electric hoist, when you start the bell valves, chain electric hoist pull hook, derrick vertical rise, thus to raise its bell, thus make bell jar and seat produced distance, bell valves at the ends of the line is connected, realize the flue gas emissions. On the other hand, the link chain electric hoist hook down, bell under gravity whereabouts, until the access to the seat, so it will be at the ends of the pipeline gas cutting.
B:卷?yè)P(yáng)機(jī)型Windlass:
當(dāng)卷?yè)P(yáng)機(jī)得到動(dòng)作信號(hào),開(kāi)啟鐘罩閥時(shí),卷?yè)P(yáng)機(jī)拉緊鋼絲繩,吊桿垂直上升,從而將鐘罩提升,這樣就使鐘罩與閥座產(chǎn)生了距離,鐘罩閥兩端的管路就連通了,實(shí)現(xiàn)煙氣的排放。反之,卷?yè)P(yáng)機(jī)松開(kāi)鋼絲繩,鐘罩在重力的作用下落下,直到接觸到閥座,這樣就將管路兩端的煙氣截?cái)嗔恕?br />When the hoist to get action signal, when you start the bell valves, hoist taut wire rope, derrick vertical rise, thus to raise its bell, thus make bell jar and seat produced distance, bell valves at the ends of the line is connected, realize the flue gas emissions. On the other hand, the release of wire rope hoist, bell under the gravity whereabouts, until the access to the seat, so it will be at the ends of the pipeline gas cutting.